Breakdowns lead to long interruptions.

Answer: a
Explanation: Breakdowns lead to long interruptions. They are considered as a loss that TPM tries to eliminate. The repairs are also expensive and therefore breakdowns must be avoided.
 

Tìm kiếm

Back
Top