Ngô Thị Vân
New member
Acceptance sampling is not used when _____________
A. The test is destructive
B. The cost of 100% inspection is quite high
C. The supplier’s process capability is very high
D. Although the supplier process is satisfactory but a program is needed for continuous monitoring
A. The test is destructive
B. The cost of 100% inspection is quite high
C. The supplier’s process capability is very high
D. Although the supplier process is satisfactory but a program is needed for continuous monitoring