Confidence intervals are not needed for \(\widehat{C_{pkm}}\).

Answer: b
Explanation: All the estimates of the process capability ratios are point estimates. This means there is a strong possibility of error due to statistical fluctuation. So confidence interval is needed also for \(\widehat{C_{pkm}}\).
 

Tìm kiếm

Back
Top