In vacuum method, the top of bore hole is sealed by __________

In vacuum method, the top of bore hole is sealed by __________
A. soil cement
B. bentonite
C. clay
D. soil cement, bentonite and clay
 
Answer: d
Explanation: The coarse sand is shovelled into the hole to fill upto about 0.75m to 1m from the top. The top portion of the bore hole is sealed up by tamping soil cement, bentonite or clay.
 