Thành Nguyễn
New member
What is the value of work done for the following arrangement?
If, m$_{1}$ = Mass of refrigerant passing through the evaporator
m$_{2}$ = Mass of refrigerant passing through condenser
m$_{3}$ = Mass of vapor refrigerant formed in the flash chamber
A. m$_{1}$ (h$_{2}$ – h$_{1}$) + m$_{2}$ (h$_{4}$ – h$_{3}$)
B. m$_{1}$ (h$_{2}$ – h$_{1}$) + m$_{2}$ (h$_{5}$ – h$_{4}$)
C. (h$_{8}$ – h$_{f10}$) / (h$_{9}$ – h$_{f10}$)
D. (h$_{1}$ – h$_{f10}$) / (h$_{4}$ – h$_{9}$)
If, m$_{1}$ = Mass of refrigerant passing through the evaporator
m$_{2}$ = Mass of refrigerant passing through condenser
m$_{3}$ = Mass of vapor refrigerant formed in the flash chamber
A. m$_{1}$ (h$_{2}$ – h$_{1}$) + m$_{2}$ (h$_{4}$ – h$_{3}$)
B. m$_{1}$ (h$_{2}$ – h$_{1}$) + m$_{2}$ (h$_{5}$ – h$_{4}$)
C. (h$_{8}$ – h$_{f10}$) / (h$_{9}$ – h$_{f10}$)
D. (h$_{1}$ – h$_{f10}$) / (h$_{4}$ – h$_{9}$)