What is done for reconditioning of crossings at site?

What is done for reconditioning of crossings at site?
A. They are hammered
B. Gas welding
C. Replacing the elements
D. Filling of material in gaps
 
Answer: b
Explanation: In case of tongue rail the limit of vertical wear for 52kg and 90R rails is 6mm. For lateral wear it is 8mm. Usually gas welding is adopted to recondition crossings at site.
 

Tìm kiếm

Back
Top