The survey done on site usually covers a width of 200m on either side of the alignment.

Ngô Thị Vân

New member
The survey done on site usually covers a width of 200m on either side of the alignment.
A. True
B. False
 
Answer: a
Explanation: While doing survey on site longitudinal and cross levelling is also done 200m on either side of the alignment. This is to ensure high accuracy of the contour maps.
 

Tìm kiếm

Back
Top