Trần Thị Mai
New member
When is the Final Location survey done?
A. After the particular Railway line to be constructed is decided
B. After the Traffic survey
C. After Reconnaissance survey
D. Immediately after the collection of Field data
A. After the particular Railway line to be constructed is decided
B. After the Traffic survey
C. After Reconnaissance survey
D. Immediately after the collection of Field data