In Hoyer’s system the projection of plugs left in concrete exceeds beyond ___________

In Hoyer’s system the projection of plugs left in concrete exceeds beyond ___________
A. Middle of member
B. End of member
C. First of member
D. Transfer part of member
 
Answer: b
Explanation: One of the disadvantages of Hoyer’s system is the projection of plugs which are left in concrete exceeds beyond the end of the member, application of heavy jacks which are uneconomical, projection of plugs which are left in concrete exceeds beyond the ends of the member, additional reinforcement is required to prevent failure of shear.
 

Tìm kiếm

Back
Top