Answer: a
Explanation: In post tensioning, the concrete units are first cast by incorporating ducts or grooves to house the tendons and when the concrete attains sufficient strength, the high tensile wires are tensioned by means of jack bearing on the end face of the member and anchored by wedges or nuts.