Answer: c
Explanation: Each layer should be placed and consolidated before the preceding batch undergoes the initial set to prevent injury to the green setting concrete and to avoid surfaces of separation between the batches if taller lifts are encountered in structures like column and retaining walls, suitable regarding agents should be used.