If a = 1min, b = 1hr, c = 2hr, d = 3hr are the operation time of a particular evaporator, then which one of the following plot is correct?

Kim Trang

New member
If a = 1min, b = 1hr, c = 2hr, d = 3hr are the operation time of a particular evaporator, then which one of the following plot is correct?
A.
B.
C.
D.
 
Answer: b
Explanation: These lines in the Duhring’s plot correspond to a particular concentration of the solution, hence as the process in the evaporator proceeds, the line moves upwards, hence as time increases, the correct plot is given above.
 

Tìm kiếm

Back
Top