Which scheduler takes their designs at design time?

Trương Duy

New member
Which scheduler takes their designs at design time?
A. preemptive scheduler
B. non preemptive scheduler
C. dynamic scheduler
D. static scheduler
 
Answer: d
Explanation: The static scheduler take their designs at the design time and it also generates tables of start times which are forwarded to a simple dispatcher but the dynamic scheduler takes a decision at the run-time.
 

Tìm kiếm

Back
Top