The proper watering or curing for a period of at least 10 days should be done to the missionary work in case of ________
A. Horizontal movement of the earth
B. Unequal settlement of the masonry
C. Unequal settlement of the sub-soil
D. Lateral pressure on the superstructure
Answer: b
Explanation: Proper watering or curing is done to ensure the development of adequate strength of mortar joints. In this case, the masonry work should be raised evenly.