The required resources for communication between end systems are reserved for the duration of the session between end systems in ________

The required resources for communication between end systems are reserved for the duration of the session between end systems in ________ method.
A. Packet switching
B. Circuit switching
C. Line switching
D. Frequency switching
 
Answer: b
Explanation: In circuit switching, a physical path between the sender and receiver is established. This path is maintained until the connection is needed. Circuit switching is implemented in the Physical layer and is used in telephonic systems.
 

Tìm kiếm

Back
Top