What is the detention time considered while designing a primary sedimentation tank which is followed by an activated sludge treatment tank?

What is the detention time considered while designing a primary sedimentation tank which is followed by an activated sludge treatment tank?
A. 1hr
B. 1.5-2.5hrs
C. 3hrs
D. 3-4hrs
 
Answer: b
Explanation: The detention time considered while designing a primary sedimentation tank, which is followed by activated sludge treatment tank is 1.5-2.5 hrs. This majorly depends on the amount of TSS and BOD present in the raw waste water. In most cases, it is considered as 2.5 hrs.
 

Tìm kiếm

Back
Top